www.institutefusenedtech.org

Home | FUSION ENERGY ~ THE PUBLIC'S GUIDE(TM) The Children's Series(TM) Books and Early STEM Education | Restricted University Course:"Advanced Nuclear Design & Radwaste Management"(TM)(C.) | Fusion Energy ~ The Public's Guide(TM) A Paradigm Change - Online Course(C) | Homepage: "1.6 Degrees C., Rising And YOUR Critical Role In CLIMATE CHANGE!"(TM)(C.) | Information Page:"1.6 Degrees C., Rising And YOUR Critical Role In CLIMATE CHANGE!"(TM)(C.) | 2019 Episodes | RADIO PRESS RELEASE | Introductory Video | "Why Do We Need Fusion Energy?" | Public Seminar Series | Press Room | Article One | Article Two | Article Three | Article Four | Article Five | Article Six | Article Seven | Article Eight | Article Nine | Article Ten | Article Eleven | Article Twelve | Article Thirteen | Article Fourteen | Blog | Series Master Diagram | About the Series | Volume I | Volume II | Volume III | VOLUME XI | VOLUME XII: | About "The Institute " | "The Institute" | Become A Member | Member's Sign-in | Founder - Author | About Seminars | Book Signing and Education Tours/Seminars | The American Democracy Project | Write Your Elected Representatives | Your U.S. Representatives and Senators | FAQs | Contact Us | CONTACT PUBLISHER
Projects by The Director-Author

 
 
Ms. Davis has made a major contribution to the following professional design, architecture and engineering projects:

THANK YOU FOR YOUR PATIENCE. THIS PAGE IS UNDERGOING RE-CONSTRUCTION.
 
 -    Troy High School, W. K. Doyle Middle School, Schools 14, 16, 18:   New Music Department, New Project Space,   New Library, New Addition
and Renovations throughout 5 schools (NY State LEEDS PROGRAM Green/Sustainable Design Project) $35MM.

-          -   First Greenberg School District, three schools in the School  District involving K-6, Middle and High school renovation and  new construction with advanced electronic laboratory and computing labs, electrical, mechanical, energy management and conservation and (NY State LEEDS PROGRAM Green/Sustainable Design Project) $120MM.                                  

-              -      Erie County (State of New York at Albany) Criminal Court House: complete renovation and envelope retrofit; space planning re-design with additional electro-mechanical and hvac requirements integrated into the space planning; new judges chambers; new FBI and ADA quarters with all appropriate electro-mechanical and computing support systems. (NY State LEEDS PROGRAM Green/Sustainable Design Project $105MM);

 -      Del  -     Delta Terminal and Underground Link Rail System Complex -Logan Airport, Boston. MA.;       

               -      Convent of the Sacred Heart School, New York City     

               -      SUNY at Long Island University - New College Library (Sustainable green design project)

 (Sustai-      St. Vincents Hospital, New York City

               -          Veterans Hospital, New York City Renovation and New

               -     New Music College at SUNY, Fredonia Campus, new buildin

-      La-    Landmark Building Condominium Conversion, New York City,  Mixed-Use Project      

 -         -    Babylon School at Long Island, New York

-      Q -   Queens College Teachers College Public School 499Q K - High School with Special Education and ADA Teaching Facility through High School;

-       C-    Columbia University - Teacher's College Landmark & Preservation Custom Project, NYC 

            -   University of Michigan new DNA and Genome Research and Teaching Center Complex, at Ann Arbor, Michigan (Sustainable Green Desgin Project)

               Civil/Heavy Construction Engineering and Transportation Projects:

                -    JFK Airport OMSF new High-Speed Train Facility, JFK into NYC   AirTrain $6.5BB

                -     JFK/East Side Access new high-speed train Facility, JFK into NYC

                -     MTA-DOT Bus Depot Repair Facility, NYC. (QA/QC Audit and wrote  Contract Construction Spec Documents from which to build architecture and engineering); wrote the entire Construction Specification Document.

-Shea --   Stadium, code compliance upgrade prepared Construction Document     Specifications.

 A/E P  A/E Projects included:

 -   Albany Criminal Court House (Holding cells, FBI and D.A. Headquarters)

 -    New Academic Library at West Point, New York;

 -    New Dormitory for DASNY at SUNY;

 -   P.S. 157Q, P.S. 14, P.S. 74, P.S. Envelope and structural rehab;

-    New USPS Post Office at Wantagh Station, Long island, NY. (Sustainable Green Design Project)

-    Fort Drum Department of  Defense, Division of  the Army new Military Personnel Families Support Services Center, New York State, D.O.D., using U.S. Army Corps of Engineers Spectext Specifications. $5MM project.

 -   $15MM Architecture/Engineering Construction Specifications Document for new Golf Course including Clubhouse and 10 supporting out buildings (using Army Corps of Engineers CSI 6-place format)

-    $250MM Architecture/Engineering Construction Specifications Document for  new 28MM Gallon Water Purification project subterranean, with brand new Community and Recreation Sports Center at grade level (DEP spec format);

--          $100MM Architecture/Engineering Construction Specifications Document for unique brand new water infiltration prevention system for Mahan Hall of West Point Naval Academy, New York (custom-written spec format/content);

-     $25MM Architecture/Engineering Construction Specification Document for Harding High School renovation and gut rehabilitation, Bergen County, New Jersey (using MasterSpec format);

--    $50MM FY2000 NYC 6 Schools Project Architecture Construction Design and Specifications Document for Two-Phase Project Masonry and structural conservation and interior preservation with exterior window and door rehabilitation (using DDC NYC ScaSpec format and custom-written specs); in-field data collection; AutoCad Vs. 14 and 2000 with SoftDesk Application prepared construction document drawings for remedies; made recommendations via reports-                Performed in-field surveys and envelope probes, wrote specification documents (using custom-designed fotmat)

 -      $25MM NYCDOT Subway Rehabilitation and Preservation Upgrade

 -      Project construction specification documents (using NYCTA spec format);

--               $3.5MM USPS new Post Office Station in Warren, New York (with FBI HQ/ Station).100% Construction Specification Documents Using USPS spec format).

-     $5MM School Project INNOVATIVE Concept in Pre-Schools for  Connecticut School Board;

-     $50MM Hospital Project - Brooklyn, New York;

-          Landmark 110th Street Theatre and Arts Museum, NYC, NY  Project.

-    $100MM Pharmaceutical Plant, Puerto Rico: New manufacturing plant for powdered medication. (involved Brownian Motion and laminar Flow

-     $25MM NYCDOT Subway Rehabilitation and Preservation Upgrade Project construction specification documents (using NYCTA spec format);

-          $3.5MM USPS new Post Office Station in Warren, New York (FBI  Station).100% Construction Specification Documents Using USPS spec format).

 

 -   Energy Engineer/Analyst/Project Manager in Facilities and Physical Plant Department

University of Pennsylvania, Phil., Pa. (Division of Physical Plant Professional Electro-Mechanical Engineering/Architecture.)

                                As Facilities and Space Designer with Specialty in Energy Management Engineering  Old Law, Section 8 and City of New York Agency buildings for energy efficiency

Facilities Project  Architect/Project Manager/Energy Engineer-           Analyst:

Vets Community Foundation, New York and Pennsylvania campuses. (Pro-Bono full-time one-year project only)

As Project Architect/Manager Manager for Architecture and Engineering:

--                Daily inspections on new high-rise structures residential, condominium and commercial office buildings in New York City, preparing construction work through last payment of invoices; advisements to Owner in regard to final payments; Hired and managed group of expediters and in-office support staff; negotiated contracts and punch lists with GCs and CMs. (~  the first six months);

 As Administrative In-House Project Manager of The Building Department Group:

Duties:

--                Manager of  Building Department Group: work involving filling out of paperwork consequential to obtaining building permits and reviews with plan examiners.  Code cognizance and compliance at all phases of work.  Managing group of  7 expediters; consulting with clients on Code; daily management of expediting forms. (~ second six months.)

 

Owners Facilities Project Representative/Sole Proprietor Diane Davis & Associates, 667 Madison Avenue, New York City, New York 10022:

As President and Director of Facilities Design and Space Planning and  Sole Proprietor Projects:

-large-scale commercial interior renovations and relocation planning and phasing of equipment and personnel  to new space planning projects;

-high-end private residential projects employing passive and active solar energy engineering technology and design methodologies; -new condominium complexes, commercial and residential projects

 

                                                     

For more information: